Since september 2011, Power System Technology, Trygone et CDF are set up into a brand new building of 1700m2.
This construction combine functionnality and esthetics with taking into account environmental considerations from the beginning of the project like use of wood in the construction, thermal isolation, transfer of the heat generated by the different soldering machines into the heating circuit of the building, natural lightgning as much as possible.
The building allows the 3 companies to work at the same location with Engineering, manufacturing and subcontracting of pcb assemblies, wires assemblies and system integration, purchasing, quality, functionnal tests and qualifications.